Our turnover package for piling includes a comprehensive set of quality documents that ensure transparency, traceability, and compliance with project requirements. Upon completion of the piling installation, we provide a detailed turnover package that includes as-built drawings, load test results (if applicable), material certificates, welding and inspection reports, and geotechnical analysis data. These documents verify that all work was carried out to the highest standards and that the piling system meets the specified design and safety criteria. The turnover package may also includes any relevant warranties, maintenance guidelines, and certification of compliance with local and international construction standards. This ensures that clients have a complete record of the project, providing assurance of the foundation's integrity and performance for the long term.
For any inquiries or questions, please contact us.